Site Material Movement

 

Material Management

Start Tour New

  • Material movement entry can be like material received, material consumed at site, material transferred from one site to another, material wastage etc.
  • This feature is useful for site supervisor, in maintaining inventory of each product consumed at site.

Material Management Report

My Notes

  • Total material consumed at each project site during given period can be known.
  • Online product detail ledger is available for each product.

Benefits

  • Total material movement can be tracked and project cost can be calculated without maintaining manual registers and data entry in excel.
  • Mischief or theft of material at site can be minimized.
  • Material consumed / wastage at each project site can be calculated for knowing project costing.